A mixed fittings order – elbows, tees, reducers, flanges and fasteners across several sizes and grades – can easily drift between quotation, purchase order and delivery. Items get substituted, split into part shipments or short-delivered, and the differences only surface at installation. A simple line-item reconciliation keeps the order under control.

Use One Line-Item Register

Keep a single register for the order, with one row per line item and the same line numbers used on the quotation, purchase order, supplier acknowledgement, packing lists and certificates.

ColumnPurpose
Line no.The same reference on every document
Description and standardType, size, wall/class, material grade and standard as ordered
Quoted / ordered quantityWhat was agreed
Approved changesSubstitutions or revisions, with approval reference
Shipped quantity and shipment no.From the packing list
Heat numbersFrom the marking and certificate
Received and acceptedAfter receiving inspection
Open quantity / NCRBalance outstanding or under nonconformance

Reconcile at Each Stage

  • Quote to PO: check every line against the quotation – size, wall, class, grade and standard – before issuing the PO.
  • PO to acknowledgement: confirm the supplier acknowledged every line without silent changes.
  • Shipment to packing list: match quantities and line numbers on each shipment.
  • Packing list to certificates: each heat number on the fittings must appear on a certificate for that line.
  • Receipt to acceptance: record accepted quantities and open any nonconformance against the line.

Close Out the Order

The order is complete only when every line shows accepted quantity equal to ordered quantity, every approved change is recorded, and every heat number is covered by a certificate. Keep the register with the document package for traceability.

Related: documenting a material substitution and dimensional inspection of delivered fittings.

Frequently Asked Questions

Why use the same line numbers on every document?

So quotation, purchase order, packing lists and certificates can be matched directly, and any difference in quantity or specification is visible immediately.

How do I handle a part shipment?

Record the shipped and accepted quantity against each line and keep the balance open until the remaining items arrive and are accepted.

What if a delivered item differs from the order?

Hold it, raise a nonconformance against the line, and accept it only through a documented substitution approval.

Drop us a line

We respects customer privacy and ensures absolute confidentiality of any information that is given to us.

We respect your privacy.

WhatsApp Get a Quote